I have got to hand it to us. It is an impressive feet of engineering to have dug this tunnel. We have been working on it for a while now and i think it is going to make things a lot more convenient. It cld be more convenient but Dody did not want the one end of the tunnel to be in the house so instead it goes from besides the wood pile and then down some steps and under where the truck usually is and then around a really big boulder and then straight for a while and then to the left and up and then down again and then up right into jakes kitchen. Now when i need to borrow a screw driver from jake i do not have to go outside except for that little bit to get to the wood pile and then i can just walk thru the tunnel over to his place. it is always abt 50 degrees down in the tunnel so i will not get cold in the winter and i will be cool in the summer and i really can not think of any thing more convenient then this tunnel.
I and jake have finished digging that under ground tunnel what goes btw our two places and we finished just in time too b/c we sure have got a lot of snow.
by Frank Dodge | Dec 19, 2007